EllisCo’s Role - Supply only, but worked with Thermosash and the electrical contractor to ensure smooth installation.
Outcome - Another natural ventilated building.
![Image name anz centre christchurch arbo architecture photography 05 for ANZ CENTRE, CHRISTCHURCH project](/assets/Uploads/e6384a1a2d/anz-centre-christchurch-arbo-architecture-photography-05.jpg)
![Image name Screen Shot 2019 04 09 at 3.26.43 PM for ANZ CENTRE, CHRISTCHURCH project](/assets/Uploads/0ee48970aa/Screen-Shot-2019-04-09-at-3.26.43-PM.png)
![Image name Screen Shot 2019 04 09 at 3.26.57 PM for ANZ CENTRE, CHRISTCHURCH project](/assets/Uploads/6a53485ded/Screen-Shot-2019-04-09-at-3.26.57-PM.png)
![Image name Screen Shot 2019 04 09 at 3.27.20 PM for ANZ CENTRE, CHRISTCHURCH project](/assets/Uploads/40fc7f482c/Screen-Shot-2019-04-09-at-3.27.20-PM.png)
EllisCo’s Role - Supply only, but worked with Thermosash and the electrical contractor to ensure smooth installation.
Outcome - Another natural ventilated building.